This job consisted of an upper and
lower metal roof that was leaking over the office area
of Dodger Industries in El Dora, Iowa. The 9,000 Sq Ft
area was power washed with TRI Sodium Phosphate to clean.
All the fasteners were tightened
and then they were coated with WPM#9. Teh vertical and
horizontal seams were taped with Butyl backed tape then
coated 3 times with WPM #9. All the stacks and
protrusions were taped and coated 3 times with #10.
The lower roof had to be flashed
against the wall of the upper roof. This was one of the
main areas it was leaking.
Before any coating could be applied
the lower roof had to have 2 coats of B-13-71 to lock
down the existing rust.
The finish coat of Astec #900 was
then sprayed twice to complete the job over the office
area.
The offices were dry, the air
conditioning bill went down, and they were guaranteed
for 10 years on both material and labor.